Short answer

First I find a reliable change signal: CDC from the database log if updates and deletes must be exact, otherwise an updated_at column that every write maintains. Each run reads rows above the stored high watermark and up to a fixed upper bound, re-reading a lookback window to catch late commits, and merges them into the target on the natural key with a guard that only newer versions win. The watermark is advanced to the newest change actually loaded, in the same transaction as the merge. Deletes come from soft-delete flags, CDC or a periodic key reconciliation, and a scheduled full refresh or row-count reconciliation catches drift.

On this page
  1. Detailed explanation
  2. 1. The change signal
  3. 2. A bounded, reproducible window
  4. 3. An idempotent, order-safe merge
  5. 4. Atomic state
  6. 5. The lookback
  7. Example
  8. Deletes
  9. Trade-offs and pitfalls
  10. Common mistakes

Detailed explanation

A full refresh is always correct but its cost grows with the whole table. An incremental load processes only what changed, which means the pipeline now has state (where it stopped) and every way that state can be wrong becomes a data bug. Structure the answer around five decisions.

1. The change signal

Signal Works for Blind spots
Increasing id Append-only tables Updates and deletes
updated_at Mutable rows where every write sets it Deletes, writes that skip the column, late commits
CDC (database log) Everything, including deletes Operating the connector

Ask the source team how updated_at is maintained (application code, trigger, ORM) before trusting it.

2. A bounded, reproducible window

Read updated_at > low AND updated_at <= high, where low comes from a state table and high is fixed for the run (the end of the data interval, or now minus a small safety lag). A retry then reads exactly the same rows.

3. An idempotent, order-safe merge

Deduplicate the window to one row per key (latest version), then MERGE on the natural key, updating only when the incoming version is newer. This is what makes re-reading safe.

4. Atomic state

Advance the watermark in the same transaction as the merge, and to the newest updated_at actually loaded, never to now(). If the run fails, the watermark has not moved and the next run retries the same window.

5. The lookback

A row’s updated_at is set when it is written but it becomes visible when its transaction commits. A long transaction can commit a row stamped earlier than the current watermark. Re-reading a lookback (for example 30 minutes, longer than the longest source transaction) catches those rows; the guarded merge ignores the ones already loaded.

Example

CREATE TABLE src (id bigint PRIMARY KEY, val text, updated_at timestamptz NOT NULL);
CREATE TABLE tgt (id bigint PRIMARY KEY, val text, updated_at timestamptz NOT NULL);
CREATE TABLE etl_state (pipeline text PRIMARY KEY, high_watermark timestamptz NOT NULL);
INSERT INTO etl_state VALUES ('src_to_tgt', '2026-10-05 10:00+00');
INSERT INTO src VALUES (1, 'a', '2026-10-05 09:50+00'),   -- committed late, inside the lookback
                       (2, 'b', '2026-10-05 10:10+00');

BEGIN;
CREATE TEMP TABLE batch ON COMMIT DROP AS
SELECT DISTINCT ON (id) s.*
FROM src AS s, etl_state AS st
WHERE st.pipeline = 'src_to_tgt'
  AND s.updated_at >  st.high_watermark - interval '30 minutes'   -- lookback
  AND s.updated_at <= timestamptz '2026-10-05 11:00+00'           -- fixed upper bound
ORDER BY id, updated_at DESC;

MERGE INTO tgt AS t USING batch AS b ON t.id = b.id
WHEN MATCHED AND b.updated_at > t.updated_at THEN UPDATE SET val = b.val, updated_at = b.updated_at
WHEN NOT MATCHED THEN INSERT VALUES (b.id, b.val, b.updated_at);

UPDATE etl_state
SET high_watermark = GREATEST(high_watermark, COALESCE((SELECT max(updated_at) FROM batch), high_watermark))
WHERE pipeline = 'src_to_tgt';
COMMIT;

SELECT (SELECT count(*) FROM tgt) AS target_rows, high_watermark AT TIME ZONE 'UTC' AS watermark_utc FROM etl_state;
target_rows watermark_utc
2 2026-10-05 10:10:00

Row 1 is older than the stored watermark but is still loaded thanks to the lookback. Running the same block again leaves the target unchanged.

Deletes

updated_at never shows a hard delete. Options, in order of preference: CDC; a soft-delete column in the source; a periodic key reconciliation that compares the full key list from the source with the target and flags missing keys. State which one you would use and how often.

Trade-offs and pitfalls

  • A long lookback is safer but re-reads more data every run; size it from evidence about source transactions.
  • Merge cost grows with the target unless it is clustered or partitioned on the merge key or on a column you can prune by (for example, only merge into the last 90 days of partitions if older rows never change).
  • Time zones: compare timestamptz values; a local-time column jumps at daylight-saving changes.
  • Keep a safety net: a weekly full refresh, or a daily count and checksum reconciliation per partition.
  • In dbt the same design is an incremental model with unique_key, a merge or delete+insert strategy and an explicit lookback in the is_incremental() filter.

Common mistakes

  1. Setting the watermark to now() instead of the newest loaded change.
  2. Updating the watermark in a separate transaction from the load.
  3. A strict > with no lookback.
  4. Merging a window that contains several versions of the same key.
  5. Claiming the design handles deletes when it only reads updated_at.